{"id":66632,"date":"2018-08-23T18:39:14","date_gmt":"2018-08-23T15:39:14","guid":{"rendered":"https:\/\/urbeamea.ro\/albaiulia\/?p=66632"},"modified":"2018-08-23T18:39:14","modified_gmt":"2018-08-23T15:39:14","slug":"foto-por-2014-2020-sprijina-primaria-municipiului-alba-iulia-investitii-din-fonduri-europene-pentru-eficienta-energetica-a-liceului-cu-program-sportiv","status":"publish","type":"post","link":"https:\/\/urbeamea.ro\/alba\/foto-por-2014-2020-sprijina-primaria-municipiului-alba-iulia-investitii-din-fonduri-europene-pentru-eficienta-energetica-a-liceului-cu-program-sportiv\/","title":{"rendered":"FOTO: POR 2014-2020 sprijin\u0103 Prim\u0103ria Municipiului Alba Iulia. Investi\u0163ii din fonduri europene pentru eficien\u0163a energetic\u0103 a Liceului cu Program Sportiv"},"content":{"rendered":"<p><strong>Peste 6,4 milioane de lei vor fi investite \u00een lucr\u0103ri de eficien\u021b\u0103 energetic\u0103 ale Liceului cu Program Sportiv din Alba Iulia. Ast\u0103zi, 23.08.2018, la sediul ADR Centru din Alba Iulia, <\/strong><strong>primarul municipiului Alba Iulia, Mircea Hava \u0219i directorul general ADR Centru, Simion Cre\u021bu, <\/strong><strong>au semnat contractul de finan\u021bare al proiectului de reabilitare termic\u0103 \u0219i cre\u0219tere a eficien\u021bei energetice a cl\u0103dirii Liceului Sportiv. <\/strong><\/p>\n<p><strong>Proiectul cu titlul \u201dCre\u0219terea eficien\u021bei energetice a cl\u0103dirilor de \u00eenv\u0103\u021b\u0103m\u00e2nt din municipiul Alba Iulia \u2013 Liceul cu Program Sportiv\u201d va fi finan\u021bat din bugetul Regiunii Centru alocat prin Programul Opera\u021bional Regional 2014-2020, prin Prioritatea de Investi\u021bii 3.1.B, ce vizeaz\u0103 \u00eembun\u0103t\u0103\u021birea eficien\u021bei energetice \u00een cl\u0103dirile publice. <\/strong><\/p>\n<p>Liceul cu Program Sportiv din Alba Iulia a fost construit \u00een 1980 \u0219i are o suprafa\u021b\u0103 total\u0103 de 4.400 mp, cu o \u00een\u0103l\u021bime de peste 14 m \u0219i un teren de 6.000 mp. Este o cl\u0103dire cu o stare tehnic\u0103 degradat\u0103, ineficient\u0103 energetic \u0219i economic, ce \u00eenregistreaz\u0103 cele mai mari pierderi de energie prin pere\u021bii exteriori, ferestre si plan\u0219eul de peste ultimul nivel, pierderi care genereaz\u0103 costuri ridicate cu \u00eenc\u0103lzirea pe timp de iarn\u0103. Prin contractul de finan\u021bare semnat azi, din bugetul total de 6.400.732,78 lei, suma de 6.272.718,12 lei reprezint\u0103 finan\u021barea nerambursabil\u0103 solicitat\u0103 de c\u0103tre beneficiar (aproximativ: 1.388.629,71 Euro), iar 128.014,66 lei reprezint\u0103 cofinan\u021barea asigurat\u0103 de Prim\u0103ria Municipiului Alba Iulia pentru realizarea proiectului. Prin implementarea acestui proiect, estimat a se finaliza \u00een 31.07.2020, Prim\u0103ria Municipiului urm\u0103re\u0219te sc\u0103derea nivelului gazelor cu efect de ser\u0103 de la 214,50 la 92,82 \u0219i a consumului de energie primar\u0103 de la 1.290.712,36 la 640.498,89.<\/p>\n<blockquote><p>\u201dAceast\u0103 cl\u0103dire este amplasat\u0103 \u00eentr-o zon\u0103 de protec\u021bie a monumentelor istorice \u0219i \u00een mijlocul unui cartier plin de locuin\u021be, de aceea consider c\u0103 era o prioritate acest proiect, pentru a avea un aer mai curat \u00een municipiu. A reduce cheltuielile din bugetul propriu \u0219i a putea ob\u021bine sprijin european pentru proiecte cu beneficii majore pentru comunitate este, din punctul meu de vedere, ceea ce ar trebui s\u0103 fac\u0103 orice primar ce se g\u00e2nde\u0219te la oameni. In faza de execu\u021bie a proiectului vom utiliza pe c\u00e2t posibil tehnologii nepoluante, materiale de construc\u021bie naturale, ecologice, cu impact sc\u0103zut asupra mediului \u00eenconjur\u0103tor \u0219i produse cu emisii reduse de CO2. Propunem prin acest proiect, solu\u021bii tehnice eficiente \u0219i performante de \u00eembun\u0103t\u0103\u021bire a eficien\u021bei energetice a construc\u021biei. Aceste solu\u021bii ne sus\u021bin \u00een demersurile noastre de a facilita accesul liber la produse si servicii de calitate, la sisteme de s\u0103n\u0103tate \u0219i educa\u021bie moderne, la o administra\u021bie public\u0103 transparent\u0103 \u0219i eficient\u0103\u201d, a declarat Mircea Hava, primarul municipiului Alba Iulia.<\/p>\n<p>\u201dMunicipiul Alba Iulia este deja recunoscut la nivel na\u021bional, \u0219i nu numai, ca \u0219i municipalitate care a reu\u0219it s\u0103 atrag\u0103 un buget consistent de fonduri europene \u00een perioada 2007-2013, prin care a realizat investi\u021bii care au transformat un ora\u0219 gri \u00eentr-un ora\u0219 cu o cetate vie \u0219i o infrastructur\u0103 modern\u0103, atr\u0103g\u0103toare, at\u00e2t pentru cet\u0103\u021beni, c\u00e2t \u0219i pentru turi\u0219ti. Evolu\u021bia ora\u0219ului \u00eens\u0103 nu s-a oprit ci continu\u0103 acum cu investi\u021bii \u00een cl\u0103diri, proiecte \u0219i aplica\u021bii care fac din Alba Iulia un Smart City, un ora\u0219 inteligent at\u00e2t prin modul \u00een care \u00ee\u0219i gestioneaz\u0103 resursele, c\u00e2t \u0219i prin beneficiile pe care le ob\u021bine pentru cet\u0103\u021beni. Prin acest proiect, peste 700 de elevi vor beneficia, al\u0103turi de familiile lor, de condi\u021bii optime de studiu, o cl\u0103dire cu ap\u0103 cald\u0103 \u0219i s\u0103li de clas\u0103 c\u0103lduroase, iar ora\u0219ul \u0219i cet\u0103\u021benii vor avea, la finalizarea proiectului, un nivel redus cel pu\u021bin la jum\u0103tate, al consumului de energie \u0219i al gazelor de ser\u0103 emise de cl\u0103dire\u201d, a declarat, \u00een momentul semn\u0103rii acestui contract de finan\u021bare, domnul Simion Cre\u021bu, director general ADR Centru.<\/p><\/blockquote>\n<p>Prin bugetul alocat proiectului se vor realiza lucr\u0103ri de reabilitare termic\u0103 a elementelor de anvelop\u0103 a cl\u0103dirii, a sistemului de \u00eenc\u0103lzire \u0219i a sistemului de furnizare a apei calde de consum. Vor fi executate lucr\u0103ri de izolare termic\u0103 a fa\u021badei \u0219i se vor \u00eenlocui cazanele din centrala termic\u0103 proprie, \u00een scopul cre\u0219terii randamentului \u0219i al reducerii emisiilor echivalent CO2. Proiectul mai prevede modernizarea instala\u021bia de distribu\u021bie a agentului termic \u0219i montarea de robinete cu cap termostatic la radiatoare. Tot din bugetul proiectului, se va instala un sistem fotovoltaic off-grid compus din 140 de panouri fotovoltaice de 250W, precum \u0219i instalarea unui sistem alternativ de producere a energiei termice prin montarea suplimentar\u0103 de pompe de c\u0103ldura aer-ap\u0103. Instala\u021bia de iluminat a cl\u0103diri se va moderniza instalarea unor corpuri de iluminat cu eficien\u021b\u0103 energetic\u0103 ridicat\u0103 \u0219i durat\u0103 mare de via\u021b\u0103, dar \u0219i cu senzori de mi\u0219care acolo unde se impun. De asemenea, se vor repara elementele de construc\u021bie ale fa\u021badei care prezint\u0103 poten\u021bial pericol de desprindere \u0219i se vor moderniza instala\u021biile \u0219i echipamentele montate aparent pe fa\u021badele cl\u0103dirii, precum si trotuarele de protec\u021bie.<\/p>\n<div id='gallery-1' class='gallery galleryid-66632 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"71\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377-150x71.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377-150x71.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377-640x305.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377-768x366.jpg 768w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377-1280x610.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1377.jpg 2048w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"93\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381-150x93.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381-150x93.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381-640x397.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381-768x477.jpg 768w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381-1280x794.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1381.jpg 1795w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"123\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386-150x123.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386-150x123.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386-640x526.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386-768x632.jpg 768w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386-1280x1053.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1386.jpg 1559w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"113\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387-150x113.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387-150x113.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387-640x483.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387-768x579.jpg 768w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387-1280x966.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1387.jpg 1628w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"126\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389-150x126.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389-150x126.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389-640x539.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389-768x646.jpg 768w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389-1280x1077.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2018\/08\/DSC_1389.jpg 1541w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Peste 6,4 milioane de lei vor fi investite \u00een lucr\u0103ri de eficien\u021b\u0103 energetic\u0103 ale Liceului cu Program Sportiv din Alba Iulia. Ast\u0103zi, 23.08.2018, la sediul ADR Centru din\u2026<\/p>\n","protected":false},"author":17,"featured_media":66635,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6663],"tags":[343,31,11144,671,16038,16039,308,76],"localitate":[25714],"class_list":["post-66632","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economic","tag-adr-centru","tag-alba-iulia","tag-contract-de-finantare","tag-liceul-cu-program-sportiv","tag-lucrari-de-eficienta-energetica","tag-proiect-de-reabilitare-termica","tag-stiri","tag-urbea-mea","localitate-alba-iulia"],"_links":{"self":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/posts\/66632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/comments?post=66632"}],"version-history":[{"count":0,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/posts\/66632\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/media\/66635"}],"wp:attachment":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/media?parent=66632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/categories?post=66632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/tags?post=66632"},{"taxonomy":"localitate","embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/localitate?post=66632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}