{"id":72856,"date":"2019-03-07T18:33:05","date_gmt":"2019-03-07T16:33:05","guid":{"rendered":"https:\/\/urbeamea.ro\/albaiulia\/?p=72856"},"modified":"2019-03-07T18:33:10","modified_gmt":"2019-03-07T16:33:10","slug":"foto-peste-doua-milioane-lei-fonduri-regio-pentru-modernizarea-scolii-din-stremt","status":"publish","type":"post","link":"https:\/\/urbeamea.ro\/alba\/foto-peste-doua-milioane-lei-fonduri-regio-pentru-modernizarea-scolii-din-stremt\/","title":{"rendered":"FOTO: Peste dou\u0103 milioane lei fonduri REGIO pentru modernizarea \u0219colii din Strem\u021b"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>La sf\u00e2r\u0219itul anului 2021, elevii \u0218colii Gimnaziale din comuna Strem\u021b vor beneficia de o cl\u0103dire complet modernizat\u0103 \u0219i de dot\u0103ri noi pentru cursuri. <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Acest fapt va fi posibil ca urmare a implement\u0103rii proiectului finan\u021bat \u00een cadrul Axei Prioritare 10.1 a Programului Opera\u021bional Regional 2014-2020, dup\u0103 semnarea de azi a contractului de finan\u021bare pentru proiectul <em>\u201eModernizare \u0219coala gimnazial\u0103 \u00een satul Strem\u021b, comuna Strem\u021b, jude\u021bul Alba\u201d<\/em> de c\u0103tre primarul localit\u0103\u021bii, domnul Traian \u0218tefan Popa \u0219i de domnul Simion Cre\u021bu, director general ADR Centru. Valoarea total\u0103 a proiectului este de peste 2,3 milioane lei, din care fondurile nerambursabile reprezint\u0103 circa 98% din suma cheltuielilor eligibile, adic\u0103 mai mult de 500.000 euro. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru acest proiect, finan\u021barea este acordat\u0103 \u00een cadrul Programului\nREGIO 2014-2020, pentru investi\u021bii \u00een educa\u021bie \u0219i&nbsp; formare, pentru dob\u00e2ndirea de competen\u021be \u0219i\n\u00eenv\u0103\u021bare pe tot parcursul vie\u021bii, prin dezvoltarea infrastructurilor de\neduca\u021bie \u0219i formare, \u00een conformitate cu apelul de proiecte dedicat\n\u00eenv\u0103\u021b\u0103m\u00e2ntului obligatoriu. Obiectivul general al proiectului \u00eel reprezint\u0103\ncre\u0219terea gradului de participare a popula\u021biei \u0219colare din \u00eenv\u0103\u021b\u0103m\u00e2ntul\nobligatoriu la un sistem educa\u021bional performant, care s\u0103 asigure resursele\numane necesare unei dezvolt\u0103ri socio-economice durabile. Pe l\u00e2ng\u0103 cre\u0219terea\naccesului, calit\u0103\u021bii \u0219i atractivit\u0103\u021bii educa\u021biei, care contribuie astfel la\ncre\u0219terea ratei de participare la diferite niveluri de educa\u021bie, obiectivul\nspecific al acestui proiect include asigurarea unei oferte educa\u021bionale\nadecvate tuturor copiilor din mediul rural, accesibil\u0103 \u0219i de calitate, precum\n\u0219i asigurarea de \u0219anse \u0219i oportunit\u0103\u021bi egale pentru educa\u021bie. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201dPrim\u0103ria Strem\u021b \u0219i-a asumat, prin strategia local\u0103 de dezvoltare, atingerea acestui obiectiv realiz\u00e2nd prin investi\u021bia propus\u0103 primul pas, respectiv de modernizare a \u0218colii gimnaziale din satul Strem\u021b, care asigur\u0103 educa\u021bia a unui num\u0103r de 177 de elevi. Indirect, proiectul nostru se adreseaz\u0103 popula\u021biei din comun\u0103, prin \u00eembun\u0103t\u0103\u021birea structurii de \u00eenv\u0103\u021b\u0103m\u00e2nt \u0219i a actului didactic, precum \u0219i prin dotarea corespunz\u0103toare a s\u0103lilor de clas\u0103. Cre\u0219terea nivelului de educa\u021bie al copiilor din comuna noastr\u0103 asigur\u0103 premisele unei viitoare genera\u021bii de locuitori mai informa\u021bi, mai responsabili \u00een rela\u021bia cu comunitatea local\u0103 \u0219i mediul \u00eenconjur\u0103tor, mai implica\u021bi \u00een via\u021ba economic\u0103 \u0219i social\u0103 a localit\u0103\u021bii\u201d<\/em>, a declarat domnul primar Traian \u0218tefan Popa, \u00een momentul semn\u0103rii acestui contract de finan\u021bare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proiectul de <em>\u201eModernizare \u0219coala gimnazial\u0103 \u00een satul Strem\u021b, comuna Strem\u021b, jude\u021bul Alba\u201d<\/em> prevede lucr\u0103ri de modernizare a cl\u0103dirii existente a \u0219colii, unde \u00eenva\u021b\u0103 aproape 180 de elevi. Se vor realiza lucr\u0103ri pentru \u00eenlocuirea elementelor de \u0219arpant\u0103 deteriorate \u0219i \u00eenlocuirea \u0219ipcilor, inclusiv \u00eenlocuirea integral\u0103 a sistemului de scurgere a apelor, se vor amenaja rigole de dirijare a apelor provenite din burlane. De asemenea, se vor desface tencuielile interioare \u0219i exterioare deteriorate, dar \u0219i pardoselile existente \u0219i se vor realiza pere\u021bi de compartimentare, astfel \u00eenc\u00e2t s\u0103 rezulte grupuri sanitare noi \u0219i un hol care sa deserveasc\u0103 accesul. Se vor realiza noi instala\u021bii electrice, sanitare, termice; noi tencuieli interioare, precum \u0219i un termosistem din polistiren expandat. Investi\u021bia prevede \u0219i dotarea corespunz\u0103toare cu mobilier \u0219i tehnica de calcul a claselor de curs. Bugetul cererii de finan\u021bare este de 2.368.949,14 lei, din care 2.306.000 lei reprezint\u0103 finan\u021barea nerambursabil\u0103 acordat\u0103 de AMPOR, iar lucr\u0103rile se vor finaliza p\u00e2n\u0103 la sf\u00e2r\u0219itul lunii noiembrie 2021.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201dLocalit\u0103\u021bile mici, din mediul rural, au aceast\u0103 \u0219ans\u0103 de a accesa resurse financiare nerambursabile europene pentru \u00eembun\u0103t\u0103\u021birea bazei materiale \u00een educa\u021bie. Este pentru prima dat\u0103 c\u00e2nd Programul REGIO finan\u021beaz\u0103 investi\u021bii \u00een comuna Strem\u021b din jude\u021bul Alba \u0219i este bine c\u0103 aceste fonduri degreveaz\u0103 bugetul local, pentru cre\u0219terea \u00eencrederii cet\u0103\u021benilor \u00een activitatea administra\u021biei publice, dar \u0219i pentru \u00eembun\u0103t\u0103\u021birea interesului elevilor \u0219i p\u0103rin\u021bilor fa\u021b\u0103 de studiu\u201d, <\/em>a declarat domnul Simion Cre\u021bu, director general ADR Centru.<\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Semnare-contract-1280x792.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"792\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Semnare-contract-1280x792.jpg\" alt=\"\" data-id=\"72857\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72857\" class=\"wp-image-72857\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Semnare-contract-1280x792.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Semnare-contract-150x93.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Semnare-contract-640x396.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Semnare-contract-768x475.jpg 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Stremt.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1134\" height=\"651\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Stremt.jpg\" alt=\"\" data-id=\"72858\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72858\" class=\"wp-image-72858\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Stremt.jpg 1134w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Stremt-150x86.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Stremt-640x367.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto1-Stremt-768x441.jpg 768w\" sizes=\"auto, (max-width: 1134px) 100vw, 1134px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract-1280x802.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"802\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract-1280x802.jpg\" alt=\"\" data-id=\"72859\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72859\" class=\"wp-image-72859\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract-1280x802.jpg 1280w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract-150x94.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract-640x401.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract-768x481.jpg 768w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Semnare-contract.jpg 1942w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Stremt.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1216\" height=\"663\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Stremt.jpg\" alt=\"\" data-id=\"72860\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72860\" class=\"wp-image-72860\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Stremt.jpg 1216w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Stremt-150x82.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Stremt-640x349.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto2-Stremt-768x419.jpg 768w\" sizes=\"auto, (max-width: 1216px) 100vw, 1216px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Semnare-contract.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"997\" height=\"821\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Semnare-contract.jpg\" alt=\"\" data-id=\"72861\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72861\" class=\"wp-image-72861\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Semnare-contract.jpg 997w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Semnare-contract-150x124.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Semnare-contract-640x527.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Semnare-contract-768x632.jpg 768w\" sizes=\"auto, (max-width: 997px) 100vw, 997px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Stremt.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1164\" height=\"574\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Stremt.jpg\" alt=\"\" data-id=\"72862\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72862\" class=\"wp-image-72862\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Stremt.jpg 1164w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Stremt-150x74.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Stremt-640x316.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto3-Stremt-768x379.jpg 768w\" sizes=\"auto, (max-width: 1164px) 100vw, 1164px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto4-Stremt.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"982\" height=\"632\" src=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto4-Stremt.jpg\" alt=\"\" data-id=\"72863\" data-link=\"https:\/\/urbeamea.ro\/alba\/?attachment_id=72863\" class=\"wp-image-72863\" srcset=\"https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto4-Stremt.jpg 982w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto4-Stremt-150x97.jpg 150w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto4-Stremt-640x412.jpg 640w, https:\/\/urbeamea.ro\/alba\/wp-content\/uploads\/2019\/03\/Foto4-Stremt-768x494.jpg 768w\" sizes=\"auto, (max-width: 982px) 100vw, 982px\" \/><\/a><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>La sf\u00e2r\u0219itul anului 2021, elevii \u0218colii Gimnaziale din comuna Strem\u021b vor beneficia de o cl\u0103dire complet modernizat\u0103 \u0219i de dot\u0103ri noi pentru cursuri. Acest fapt va fi posibil\u2026<\/p>\n","protected":false},"author":17,"featured_media":72858,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6663],"tags":[307,2211,17315,16003,308,76],"localitate":[25734],"class_list":["post-72856","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economic","tag-alba","tag-finantare","tag-scoala-gimnaziala-stremt","tag-semnare-contract","tag-stiri","tag-urbea-mea","localitate-stremt"],"_links":{"self":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/posts\/72856","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/comments?post=72856"}],"version-history":[{"count":0,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/posts\/72856\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/media\/72858"}],"wp:attachment":[{"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/media?parent=72856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/categories?post=72856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/tags?post=72856"},{"taxonomy":"localitate","embeddable":true,"href":"https:\/\/urbeamea.ro\/alba\/wp-json\/wp\/v2\/localitate?post=72856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}