{"id":101988,"date":"2022-05-19T12:25:24","date_gmt":"2022-05-19T09:25:24","guid":{"rendered":"https:\/\/urbeamea.ro\/albaiulia\/?p=101988"},"modified":"2022-05-19T12:25:26","modified_gmt":"2022-05-19T09:25:26","slug":"consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1","status":"publish","type":"post","link":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/","title":{"rendered":"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>Situa\u0163ia ini\u0163ial\u0103<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua ce va lega Mun\u021bii Apuseni de autostrad\u0103. Valoarea contractului pentru Lotul 1, cei 40 de km de drum ce pleac\u0103 din municipiul Aiud, partener \u00een proiect, a fost de 74.184.474 lei. Termen de finalizare &#8211; prim\u0103vara anului 2023. Valoarea total\u0103 a proiectului dep\u0103\u0219e\u0219te 188 de milioane de lei, banii provenind din fonduri europene.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Situa\u021bia actual\u0103<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen decembrie 2021, antreprenorul principal a intrat sub protec\u021bia legii insolven\u021bei fapt care, implicit, a atras dup\u0103 sine complica\u021bii \u0219i \u00eencetinirea ritmului \u00een derularea lucr\u0103rilor. La acel moment, modernizarea DJ 107 I era unul dintre pu\u021binele, dar \u0219i printre cele mai importante contracte r\u0103mase \u00een patrimoniul firmei. Suplimentar acestei situa\u021bii, odat\u0103 cu falimentul City Insurance, compania nu a mai reu\u0219it s\u0103 ofere o garan\u021bie de bun\u0103 execu\u021bie, aferent\u0103 \u0219i esen\u021bial\u0103 contractului, \u00een cuantum de 10% din valoare. Nu a fost posibil\u0103 nicio alt\u0103 variant\u0103 de garantare, nefiind o op\u021biune pentru asiguratori \u00een cazul contractelor ce dep\u0103\u0219esc \u0219ase luni \u00een executare. De asemenea, nu a putut fi pus\u0103 \u00een practic\u0103 re\u021binerea succesiv\u0103 din valoarea facturilor par\u021biale. \u00cen acest moment, stadiul lucr\u0103rilor pe acest lot este de 30%, cu valoare decontat\u0103 de 24.000.000 de lei. Practic, vorbim de terasamente, consolid\u0103ri, pode\u021be, ziduri de sprijin, \u0219anturi betonate \u0219i rigole, 13 km strat de leg\u0103tur\u0103 \u0219i alte elemente puse \u00een oper\u0103.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p><em>Ce vede oricine se uit\u0103, \u00een aceast\u0103 spe\u021b\u0103, la Consiliul Jude\u021bean, este doar bun\u0103voin\u021b\u0103 \u0219i dorin\u021ba de a nu compromite un obiectiv at\u00e2t de important. Toate facturile par\u021biale emise de constructor au fost pl\u0103tite \u00een maximum 5 zile. Noi am \u00een\u021beles s\u0103 nu gener\u0103m dificult\u0103\u021bi \u00een planul de reorganizare, iar banii nu au fost niciodat\u0103 o problem\u0103 la fiecare etap\u0103 raportat\u0103. Am pl\u0103tit la timp! Singura institu\u021bie care poate \u00een\u021belege \u0219i accepta orice neajuns e biserica, dar nu un finan\u021bator \u0219i un beneficiar care ajunge s\u0103 se roage de constructor s\u0103 intre \u00een cerin\u021bele legilor. Am fost l\u00e2ng\u0103 d\u00e2n\u0219ii, ne-am \u00eent\u00e2lnit ori de c\u00e2te ori a fost cazul, dar f\u0103r\u0103 un rezultat. E cazul s\u0103 recuper\u0103m, pentru c\u0103 toate localit\u0103\u021bile partenere \u00eent\u00e2mpin\u0103 condi\u021bii de \u0219antier nejustificate. \u00cen privin\u021ba celuilalt lot, evalu\u0103m permanent lucr\u0103rile \u0219i anticip\u0103m orice scenariu spre care ne putem \u00eendrepta.<\/em> <\/p><cite> Marius Ha\u021began, vicepre\u0219edinte CJ Alba<\/cite><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Obstacolul principal \u0219i motivul care a impus rezilierea contractului pe acest lot este tocmai faptul c\u0103, f\u0103r\u0103 garan\u021bie de bun\u0103 execu\u021bie, finan\u021batorul nu accept\u0103 cererile de rambursare. Termenul de 90 de zile ce se aplic\u0103 \u0219i \u00een acest caz, de la declararea falimentul asiguratorului, a fost atins la data de 19 aprilie 2022, iar Societatea Construc\u021bii Napoca nu a oferit niciun instrument de garantare, motiv pentru care contractul a fost reziliat.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p><em>Nu sunt omul care s\u0103 ocoleasc\u0103 \u0219i s\u0103 se prefac\u0103 c\u0103 nu regret\u0103 aceast\u0103 situa\u021bie. Sunt 6 km din acest drum ce traverseaz\u0103 Aiudul \u0219i pe care to\u021bi ni-i dorim moderniza\u021bi \u0219i practicabili. Din p\u0103cate, constructorul a dat foaia goal\u0103 la acest test. \u00cen\u021beleg situa\u021bia, dar sunt obligat\u0103 s\u0103 pretind Consiliul Jude\u021bean o c\u00e2t mai mare aten\u021bie \u00een a face o trecere c\u0103tre un nou constructor, asigur\u00e2nd condi\u021bii bune pentru tranzit \u0219i trafic, pentru cei care folosesc frecvent str\u0103zile Avram Iancu \u0219i Mo\u021bilor sau locuiesc pe acestea. Cei care au apetit pentru a panica \u0219i denatura adev\u0103rul ar face bine s\u0103 priceap\u0103 c\u0103 eficien\u021ba poate fi compromis\u0103 de situa\u021bii ca asta. Important e c\u0103, azi, problema asta e pe masa unor oameni care \u0219tiu ce au de f\u0103cut!<\/em><\/p><cite>Oana Badea, primarul municipiului Aiud<\/cite><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\"><em>M\u0103suri<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Consiliul Jude\u021bean Alba va parcurge c\u00e2t mai rapid etapa de expertiz\u0103, pentru a determina valorile actualizate \u0219i ce mai este de executat, urm\u00e2nd s\u0103 declan\u0219eze o procedur\u0103 accelerat\u0103 pentru ca, \u00een maximum trei luni, un nou constructor s\u0103 preia acest lot.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua ce va lega Mun\u021bii Apuseni de autostrad\u0103. Valoarea contractului pentru Lotul 1, cei 40 de km de drum ce pleac\u0103 din municipiul Aiud, partener \u00een proiect, a fost de 74.184.474 lei. Termen de &hellip;<\/p>\n","protected":false},"author":16,"featured_media":101992,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[2035],"tags":[784,11578],"class_list":["post-101988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-administratie","tag-consiliul-judetean-alba","tag-transalpina-de-apuseni"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1 - Revista Urbea Mea - Revista de Alba<\/title>\n<meta name=\"description\" content=\"Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1 - Revista Urbea Mea - Revista de Alba\" \/>\n<meta name=\"twitter:description\" content=\"Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2022\/05\/transalpina-apuseni.png\" \/>\n<meta name=\"twitter:creator\" content=\"@urbeameaweb\" \/>\n<meta name=\"twitter:site\" content=\"@urbeameaweb\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/\"},\"author\":{\"name\":\"Redac\u021bia UrbeaMea\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#\\\/schema\\\/person\\\/272ae98052f8ee8980f59848df070247\"},\"headline\":\"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1\",\"datePublished\":\"2022-05-19T09:25:24+00:00\",\"dateModified\":\"2022-05-19T09:25:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/\"},\"wordCount\":710,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/transalpina-apuseni.png\",\"keywords\":[\"Consiliul Judetean Alba\",\"transalpina de apuseni\"],\"articleSection\":[\"Administra\u021bie\"],\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/\",\"name\":\"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1 - Revista Urbea Mea - Revista de Alba\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/transalpina-apuseni.png\",\"datePublished\":\"2022-05-19T09:25:24+00:00\",\"dateModified\":\"2022-05-19T09:25:26+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#\\\/schema\\\/person\\\/272ae98052f8ee8980f59848df070247\"},\"description\":\"Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#primaryimage\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/transalpina-apuseni.png\",\"contentUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/transalpina-apuseni.png\",\"width\":832,\"height\":562},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Prima pagin\u0103\",\"item\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#website\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/\",\"name\":\"Revista Urbea Mea, Stiri urbane\",\"description\":\"Evenimente \u0219i \u0219tiri din Alba Iulia, Sebe\u0219, Aiud, Blaj\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#\\\/schema\\\/person\\\/272ae98052f8ee8980f59848df070247\",\"name\":\"Redac\u021bia UrbeaMea\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9ce5a9435071fa1037e8468053ead8e513dbbff59009d3069aadb85506d85a27?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9ce5a9435071fa1037e8468053ead8e513dbbff59009d3069aadb85506d85a27?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9ce5a9435071fa1037e8468053ead8e513dbbff59009d3069aadb85506d85a27?s=96&d=mm&r=g\",\"caption\":\"Redac\u021bia UrbeaMea\"},\"description\":\"contact@urbeamea.ro\",\"sameAs\":[\"https:\\\/\\\/www.urbeamea.ro\"],\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/author\\\/redactia-urbeamea\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1 - Revista Urbea Mea - Revista de Alba","description":"Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/","twitter_card":"summary_large_image","twitter_title":"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1 - Revista Urbea Mea - Revista de Alba","twitter_description":"Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua","twitter_image":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2022\/05\/transalpina-apuseni.png","twitter_creator":"@urbeameaweb","twitter_site":"@urbeameaweb","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#article","isPartOf":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/"},"author":{"name":"Redac\u021bia UrbeaMea","@id":"https:\/\/urbeamea.ro\/albaiulia\/#\/schema\/person\/272ae98052f8ee8980f59848df070247"},"headline":"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1","datePublished":"2022-05-19T09:25:24+00:00","dateModified":"2022-05-19T09:25:26+00:00","mainEntityOfPage":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/"},"wordCount":710,"commentCount":0,"image":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#primaryimage"},"thumbnailUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2022\/05\/transalpina-apuseni.png","keywords":["Consiliul Judetean Alba","transalpina de apuseni"],"articleSection":["Administra\u021bie"],"inLanguage":"ro-RO","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/","url":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/","name":"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1 - Revista Urbea Mea - Revista de Alba","isPartOf":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#primaryimage"},"image":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#primaryimage"},"thumbnailUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2022\/05\/transalpina-apuseni.png","datePublished":"2022-05-19T09:25:24+00:00","dateModified":"2022-05-19T09:25:26+00:00","author":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/#\/schema\/person\/272ae98052f8ee8980f59848df070247"},"description":"Situa\u0163ia ini\u0163ial\u0103 \u00cen anul 2019, Societatea de Construc\u0163ii Napoca a c\u00e2\u015ftigat procedura de atribuire pentru execu\u0163ia lucr\u0103rilor la ambele loturi din \u0219oseaua","breadcrumb":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#primaryimage","url":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2022\/05\/transalpina-apuseni.png","contentUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2022\/05\/transalpina-apuseni.png","width":832,"height":562},{"@type":"BreadcrumbList","@id":"https:\/\/urbeamea.ro\/albaiulia\/consiliul-judetean-alba-schimba-constructorul-de-pe-transalpina-de-apuseni-lotul-1\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Prima pagin\u0103","item":"https:\/\/urbeamea.ro\/albaiulia\/"},{"@type":"ListItem","position":2,"name":"Consiliul Jude\u0163ean Alba schimb\u0103 constructorul de pe Transalpina de Apuseni, lotul 1"}]},{"@type":"WebSite","@id":"https:\/\/urbeamea.ro\/albaiulia\/#website","url":"https:\/\/urbeamea.ro\/albaiulia\/","name":"Revista Urbea Mea, Stiri urbane","description":"Evenimente \u0219i \u0219tiri din Alba Iulia, Sebe\u0219, Aiud, Blaj","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/urbeamea.ro\/albaiulia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Person","@id":"https:\/\/urbeamea.ro\/albaiulia\/#\/schema\/person\/272ae98052f8ee8980f59848df070247","name":"Redac\u021bia UrbeaMea","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/9ce5a9435071fa1037e8468053ead8e513dbbff59009d3069aadb85506d85a27?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9ce5a9435071fa1037e8468053ead8e513dbbff59009d3069aadb85506d85a27?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9ce5a9435071fa1037e8468053ead8e513dbbff59009d3069aadb85506d85a27?s=96&d=mm&r=g","caption":"Redac\u021bia UrbeaMea"},"description":"contact@urbeamea.ro","sameAs":["https:\/\/www.urbeamea.ro"],"url":"https:\/\/urbeamea.ro\/albaiulia\/author\/redactia-urbeamea\/"}]}},"_links":{"self":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts\/101988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/comments?post=101988"}],"version-history":[{"count":1,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts\/101988\/revisions"}],"predecessor-version":[{"id":101990,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts\/101988\/revisions\/101990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/media\/101992"}],"wp:attachment":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/media?parent=101988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/categories?post=101988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/tags?post=101988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}