{"id":89512,"date":"2020-05-07T16:29:22","date_gmt":"2020-05-07T13:29:22","guid":{"rendered":"https:\/\/urbeamea.ro\/albaiulia\/?p=89512"},"modified":"2020-05-07T16:29:25","modified_gmt":"2020-05-07T13:29:25","slug":"extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene","status":"publish","type":"post","link":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/","title":{"rendered":"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect REGIO 2014-2020, institu\u021bia de \u00eenv\u0103\u021b\u0103m\u00e2nt superior va beneficia de peste 1,9 milioane euro pentru modernizarea \u0219i dotarea infrastructurii de educa\u021bie a extensiei din Alba Iulia apar\u021bin\u00e2nd UTCN.<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Prin semnarea contractului de finan\u021bare care asigur\u0103 resursele necesare pentru a moderniza \u0219i \u00eembun\u0103t\u0103\u021bi condi\u021biile de studiu a mai mult de 550 de studen\u021bi, \u00een cadrul proiectului <em>\u201dDezvoltarea infrastructurii de educa\u021bie \u0219i formare la extensia din Alba Iulia, a Universit\u0103\u021bii\u00a0 Tehnice din Cluj-Napoca, \u00een vederea promov\u0103rii \u00eenva\u021b\u0103m\u00e2ntului ter\u021biar universitar\u201d<\/em>, se vor amenaja dou\u0103 amfiteatre, s\u0103li de laborator, o bibliotec\u0103 \u0219i o sal\u0103 de lectur\u0103, prin resursele gestionate de ADR Centru, \u00een cadrul Priorit\u0103\u021bii de investi\u021bii 10.1A, Obiectivul specific 10.3 pentru cre\u0219terea calit\u0103\u021bii \u00een \u00eenv\u0103\u021b\u0103m\u00e2ntul universitar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proiectul implementat la Alba Iulia de c\u0103tre UTCN va asigura condi\u021biile necesare pentru o preg\u0103tire profesional\u0103 de calitate \u0219i relevant\u0103 pentru nevoile pie\u021bei muncii \u00een domenii tehnice. Investi\u021biile presupun reabilitarea, modernizarea, extinderea \u0219i dotarea imobilului situat pe strada Alexandru Ioan Cuza, nr. 23. Suprafa\u021ba total\u0103 a terenului pe care se afl\u0103 cl\u0103direa este de 2464mp, iar corpul de cl\u0103dire supus interven\u021biilor a avut \u00een trecut destina\u021bia de cantin\u0103 \u0219colar\u0103. Acum, construc\u021bia prezint\u0103 numeroase degrad\u0103ri, datorate lipsei interven\u021biilor de \u00eentre\u021binere \u00een timp \u0219i a infiltra\u021biilor de ap\u0103. Cl\u0103direa nu mai este utilizat\u0103 de peste 5 ani \u0219i nici nu au fost luate m\u0103suri pentru conservarea acesteia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prin implementarea proiectului se va realiza reconversia cl\u0103dirii men\u021bionate \u00een noi spa\u021bii de \u00eenv\u0103\u021b\u0103m\u00e2nt universitar. Se vor efectua lucr\u0103ri de extindere, at\u00e2t \u00een plan, c\u00e2t \u0219i pe vertical\u0103. \u00cen plan, cl\u0103direa \u00ee\u0219i va m\u0103ri foarte pu\u021bin amprenta la sol, respectiv se va muta accesul \u00een cl\u0103dire de pe fa\u021bada de la strada (sud-est) pe fa\u021bada din incint\u0103 (nord-est). Extinderea pe vertical\u0103 va consta \u00een amenajarea la parter a dou\u0103 amfiteatre de c\u00e2te 150 \u0219i 120 locuri, cu un foyer \u00eentre ele, precum \u0219i a unui etaj, cu s\u0103li de cursuri\/laboratoare. \u00centruc\u00e2t amfiteatrele vor fi prev\u0103zute cu gradene, iar grinzile de peste s\u0103lile de amfiteatru vor avea \u00een\u0103l\u021bimi mari, \u00een col\u021bul nordic al cl\u0103dirii se propune realizarea unui etaj intermediar par\u021bial. Etajul intermediar \u0219i parterul de sub etajul intermediar vor cuprinde biblioteca \u0219i birouri pentru cadrele didactice. Totodat\u0103, depozitul de carte al bibliotecii va fi extins \u0219i \u00een spa\u021biile de sub gradenele de la amfiteatrul mare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Valoarea total\u0103 a cererii de finan\u021bare este de 9.062.634,54 lei, din care valoarea finan\u021b\u0103rii nerambursabile alocate pentru realizarea investi\u021biilor este de 8.864.985,09 lei, respectiv 98,00% din valoarea eligibil\u0103 a proiectului, reprezent\u00e2nd peste 1,9 milioane euro. Echipa de management a universit\u0103\u021bii estimeaz\u0103 c\u0103 data finaliz\u0103rii investi\u021biilor va fi \u00eenainte de \u00eencheierea anului universitar 2022-2023, respectiv 30 aprilie 2023.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u201dAvem deja contractate proiecte de modernizare a infrastructurii universitare la Alba Iulia \u0219i T\u00eergu Mure\u0219, a c\u0103ror valoare total\u0103 dep\u0103\u0219e\u0219te 55 milioane lei, iar preocuparea pentru astfel de investi\u021bii este foarte mare \u0219i \u00een celelalte jude\u021be unde exist\u0103 centre universitare. Sus\u021binem pe deplin \u00eembun\u0103t\u0103\u021birea cadrului institu\u021bional \u0219i oferim resurse pentru punerea \u00een valoare \u0219i dezvoltarea poten\u021bialului de competen\u021be din zona noastr\u0103, dar \u0219i pentru atragerea speciali\u0219tilor din alte zone ale \u021b\u0103rii, \u00een corelare cu cre\u0219terea gradului de adaptabilitate \u0219i de mobilitate al angaja\u021bilor, \u00eentreprinz\u0103torilor, persoanelor fizice autorizate \u0219i managerilor de la toate nivelurile din cadrul Regiunii Centru. Ne preocup\u0103 foarte mult cre\u0219terea competitivit\u0103\u021bii regionale, care se bazeaz\u0103 pe cre\u0219terea calit\u0103\u021bii \u00eenv\u0103\u021b\u0103m\u00e2ntului la toate nivelurile. Studen\u021bii \u0219i masteranzii au nevoie de laboratoare moderne \u0219i de centre de preg\u0103tire cu func\u021biuni multiple, de aceea, resursele europene nerambursabile vor sus\u021bine dezvoltarea lor personal\u0103. Proiectele de dezvoltare a Universit\u0103\u021bilor vor asigura premisele cre\u0219terii calit\u0103\u021bii \u0219i performantei \u0219tiin\u021bifice \u00een domenii importante pentru Strategia de Dezvoltare Inteligent\u0103 a Regiunii Centru. Pentru urm\u0103toarea perioad\u0103 de programare, 2021-2027, accentul se va pune tot mai mult pe capabilit\u0103\u021bile de cre\u0219tere competitiv\u0103 \u0219i de transfer rapid \u0219i eficient al cuno\u0219tin\u021belor teoretice c\u0103tre mediul de afaceri, adic\u0103 pe inovare \u0219i pe \u00eembun\u0103t\u0103\u021birea proceselor. O infrastructur\u0103 educa\u021bional\u0103 adecvat\u0103 este esen\u021bial\u0103 pentru construirea de abilita\u021bi sociale, dezvoltarea competen\u021belor profesionale \u0219i duce mai repede la integrarea socio-profesional\u0103 a absolven\u021bilor\u201d, a declarat domnul Simion Cre\u021bu, director general ADR Centru.<\/p><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Din punct de vedere fizic \u0219i func\u021bional, proiectul de fa\u021b\u0103 presupune dezvoltarea \u0219i modernizarea infrastructurii extensiei din Alba Iulia ce apar\u021bine de Universitatea Tehnic\u0103 din Cluj-Napoca. Structura func\u021bional\u0103 propus\u0103 pentru construc\u021bia modernizat\u0103 va include, la subsol, spa\u021bii tehnice cu centrala termic\u0103, central\u0103 de ventila\u021bie, spa\u021bii de depozitare etc. Organizarea spa\u021biilor interioare de la parter are \u00een vedere, \u00een primul r\u00e2nd, amenajarea celor dou\u0103 amfiteatre. Acesta este motivul mut\u0103rii accesului \u00een cl\u0103dire pe fa\u021bada de nord-est (din incint\u0103). Intrarea principal\u0103 va fi \u00een leg\u0103tur\u0103 direct\u0103 cu un foyer generos, din care se accede st\u00e2nga-dreapta \u00een amfiteatre. Din acela\u0219i foyer se poate accede la scara \u0219i ascensorul care vor face leg\u0103tura pe vertical\u0103 cu nivelele superioare. Etajul intermediar va ocupa mai pu\u021bin de o treime din amprenta la sol a parterului, \u00een col\u021bul nordic. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Spa\u021biul respectiv beneficiaz\u0103 de acces direct din casa sc\u0103rii \u0219i din ascensor. La etajul 1 vor exista un foyer, casa de scar\u0103 + ascensor pentru persoane cu dizabilit\u0103\u021bi, o sal\u0103 de curs cu 62 de locuri, coridor &#8211; din care se face accesul \u00een s\u0103lile de seminar\/laborator \u0219i ie\u0219irea pe terasa circulabil\u0103, 2 s\u0103li de laboratoare de c\u00e2te 24 de locuri fiecare \u0219i o sal\u0103 de laborator cu 16 locuri. Cl\u0103direa a fost prev\u0103zut\u0103 cu echipamente \u0219i dot\u0103ri moderne: ascensor pentru 8 persoane, utilizabil de persoanele cu dizabilit\u0103\u021bi locomotorii, iar toate spa\u021biile vor fi prev\u0103zute cu mobilier \u0219i echipamente specifice, inclusiv IT. Beneficiarii direc\u021bi ai acestei investi\u021bii sunt cei peste 550 de studen\u021bi, masteranzi \u0219i doctoranzi ai facult\u0103\u021bii albaiuliene.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"960\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1-1280x960.jpg\" alt=\"\" data-id=\"89513\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89513\" class=\"wp-image-89513\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1-1280x960.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1-640x480.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1-150x113.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1-768x576.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1-1536x1152.jpg 1536w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-1.jpg 1632w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"960\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2-1280x960.jpg\" alt=\"\" data-id=\"89514\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89514\" class=\"wp-image-89514\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2-1280x960.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2-640x480.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2-150x113.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2-768x576.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2-1536x1152.jpg 1536w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-2.jpg 1632w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"960\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3-1280x960.jpg\" alt=\"\" data-id=\"89515\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89515\" class=\"wp-image-89515\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3-1280x960.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3-640x480.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3-150x113.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3-768x576.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3-1536x1152.jpg 1536w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-3.jpg 1632w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"960\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4-1280x960.jpg\" alt=\"\" data-id=\"89516\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89516\" class=\"wp-image-89516\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4-1280x960.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4-640x480.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4-150x113.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4-768x576.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4-1536x1152.jpg 1536w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg 1632w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"863\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5-1280x863.jpg\" alt=\"\" data-id=\"89517\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89517\" class=\"wp-image-89517\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5-1280x863.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5-640x431.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5-150x101.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5-768x518.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5-1536x1036.jpg 1536w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-5.jpg 1722w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"960\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6-1280x960.jpg\" alt=\"\" data-id=\"89518\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89518\" class=\"wp-image-89518\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6-1280x960.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6-640x480.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6-150x113.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6-768x576.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6-1536x1152.jpg 1536w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-6.jpg 1632w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"525\" src=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7-1280x525.jpg\" alt=\"\" data-id=\"89519\" data-full-url=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7.jpg\" data-link=\"https:\/\/urbeamea.ro\/albaiulia\/?attachment_id=89519\" class=\"wp-image-89519\" srcset=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7-1280x525.jpg 1280w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7-640x262.jpg 640w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7-150x62.jpg 150w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7-768x315.jpg 768w, https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-7.jpg 1500w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect REGIO 2014-2020, institu\u021bia de \u00eenv\u0103\u021b\u0103m\u00e2nt superior va beneficia de peste 1,9 milioane euro pentru modernizarea \u0219i dotarea infrastructurii de educa\u021bie a extensiei din Alba Iulia apar\u021bin\u00e2nd UTCN. Prin semnarea contractului &hellip;<\/p>\n","protected":false},"author":17,"featured_media":89516,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[6663],"tags":[20594,20595,20597,20596],"class_list":["post-89512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economic","tag-extensia-albaiuliana","tag-iniversitatea-tehnica-din-cluj-napoca","tag-institutie-de-invatamant-superior","tag-modernizare-cu-fonduri-europene"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene - Revista Urbea Mea - Revista de Alba<\/title>\n<meta name=\"description\" content=\"O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene - Revista Urbea Mea - Revista de Alba\" \/>\n<meta name=\"twitter:description\" content=\"O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@urbeameaweb\" \/>\n<meta name=\"twitter:site\" content=\"@urbeameaweb\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/\"},\"author\":{\"name\":\"Cristina Ganga\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#\\\/schema\\\/person\\\/9700d21fae21c4f038b0b56f4506264a\"},\"headline\":\"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene\",\"datePublished\":\"2020-05-07T13:29:22+00:00\",\"dateModified\":\"2020-05-07T13:29:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/\"},\"wordCount\":1088,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Locatie-proiect-UTCN-AB-4.jpg\",\"keywords\":[\"extensia albaiuliana\",\"iniversitatea tehnica din cluj napoca\",\"institutie de invatamant superior\",\"modernizare cu fonduri europene\"],\"articleSection\":[\"Economic\"],\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/\",\"name\":\"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene - Revista Urbea Mea - Revista de Alba\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Locatie-proiect-UTCN-AB-4.jpg\",\"datePublished\":\"2020-05-07T13:29:22+00:00\",\"dateModified\":\"2020-05-07T13:29:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#\\\/schema\\\/person\\\/9700d21fae21c4f038b0b56f4506264a\"},\"description\":\"O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#primaryimage\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Locatie-proiect-UTCN-AB-4.jpg\",\"contentUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Locatie-proiect-UTCN-AB-4.jpg\",\"width\":1632,\"height\":1224},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Prima pagin\u0103\",\"item\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#website\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/\",\"name\":\"Revista Urbea Mea, Stiri urbane\",\"description\":\"Evenimente \u0219i \u0219tiri din Alba Iulia, Sebe\u0219, Aiud, Blaj\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/#\\\/schema\\\/person\\\/9700d21fae21c4f038b0b56f4506264a\",\"name\":\"Cristina Ganga\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/CristinaN-640x427.jpg\",\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/CristinaN-640x427.jpg\",\"contentUrl\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/CristinaN-640x427.jpg\",\"caption\":\"Cristina Ganga\"},\"description\":\"Jurnalist\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cristina.nicola.587\"],\"url\":\"https:\\\/\\\/urbeamea.ro\\\/albaiulia\\\/author\\\/cristina-nicola\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene - Revista Urbea Mea - Revista de Alba","description":"O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/","twitter_card":"summary_large_image","twitter_title":"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene - Revista Urbea Mea - Revista de Alba","twitter_description":"O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect","twitter_image":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg","twitter_creator":"@urbeameaweb","twitter_site":"@urbeameaweb","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#article","isPartOf":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/"},"author":{"name":"Cristina Ganga","@id":"https:\/\/urbeamea.ro\/albaiulia\/#\/schema\/person\/9700d21fae21c4f038b0b56f4506264a"},"headline":"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene","datePublished":"2020-05-07T13:29:22+00:00","dateModified":"2020-05-07T13:29:25+00:00","mainEntityOfPage":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/"},"wordCount":1088,"commentCount":0,"image":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#primaryimage"},"thumbnailUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg","keywords":["extensia albaiuliana","iniversitatea tehnica din cluj napoca","institutie de invatamant superior","modernizare cu fonduri europene"],"articleSection":["Economic"],"inLanguage":"ro-RO","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/","url":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/","name":"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene - Revista Urbea Mea - Revista de Alba","isPartOf":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#primaryimage"},"image":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#primaryimage"},"thumbnailUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg","datePublished":"2020-05-07T13:29:22+00:00","dateModified":"2020-05-07T13:29:25+00:00","author":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/#\/schema\/person\/9700d21fae21c4f038b0b56f4506264a"},"description":"O veste bun\u0103 pentru sute de studen\u021bi care se preg\u0103tesc la sediul din Alba Iulia al Universit\u0103\u021bii Tehnice din Cluj-Napoca (UTCN). \u00cen cadrul unui proiect","breadcrumb":{"@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#primaryimage","url":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg","contentUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2020\/05\/Locatie-proiect-UTCN-AB-4.jpg","width":1632,"height":1224},{"@type":"BreadcrumbList","@id":"https:\/\/urbeamea.ro\/albaiulia\/extensia-albaiuliana-a-universitatii-tehnice-din-cluj-napoca-se-modernizeaza-cu-fonduri-europene\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Prima pagin\u0103","item":"https:\/\/urbeamea.ro\/albaiulia\/"},{"@type":"ListItem","position":2,"name":"Extensia albaiulian\u0103 a Universit\u0103\u021bii Tehnice din Cluj Napoca se modernizeaz\u0103 cu fonduri europene"}]},{"@type":"WebSite","@id":"https:\/\/urbeamea.ro\/albaiulia\/#website","url":"https:\/\/urbeamea.ro\/albaiulia\/","name":"Revista Urbea Mea, Stiri urbane","description":"Evenimente \u0219i \u0219tiri din Alba Iulia, Sebe\u0219, Aiud, Blaj","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/urbeamea.ro\/albaiulia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Person","@id":"https:\/\/urbeamea.ro\/albaiulia\/#\/schema\/person\/9700d21fae21c4f038b0b56f4506264a","name":"Cristina Ganga","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2016\/01\/CristinaN-640x427.jpg","url":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2016\/01\/CristinaN-640x427.jpg","contentUrl":"https:\/\/urbeamea.ro\/albaiulia\/wp-content\/uploads\/2016\/01\/CristinaN-640x427.jpg","caption":"Cristina Ganga"},"description":"Jurnalist","sameAs":["https:\/\/www.facebook.com\/cristina.nicola.587"],"url":"https:\/\/urbeamea.ro\/albaiulia\/author\/cristina-nicola\/"}]}},"_links":{"self":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts\/89512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/comments?post=89512"}],"version-history":[{"count":0,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/posts\/89512\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/media\/89516"}],"wp:attachment":[{"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/media?parent=89512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/categories?post=89512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/urbeamea.ro\/albaiulia\/wp-json\/wp\/v2\/tags?post=89512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}